হট লাইন : ০২-৯১০৩৯৬০ EN
  • Construction work of gas pipelines of various diameters (1”-6”) x 50 PSIG have been completed to solve low pressure problem in different places of Dhaka city i.e. : a) Road No-3, Block-E, Section-12, Mirpur; b) Road No-7, Block-E, Section-12, Mirpur; c) West Kafrul; d) East Raza Bazar, Tejgaon; e) Arjatpara (Holding No-from 94/3 to 447); f) China Building, Rasulbag,Lalbag, Azimpur; g) Road No-3,Block-Kha, Pisciculture Housing, Shekertek, Adabar; h) Tallabag, Rayerbazar, Hazaribag ; i) Jahanara Garden, Green Road ; j) Road No-5,Block-C,Section-6,Mirpur; k) East Kazipara and Senpara Parbata; l) Elephant Road of Dhaka City (Bata Signal) m) North Gazmahal, Hazaribag, Patchtali Graveyard Area of West Badda Post Office Road and North Kafrul, Jhilpar Area ;
  • For the sake of the safety of the pipe lines, 16” dia pipe line at Bhairab, Daulatkandi Mousa: Daulatkandi, 6” dia pipeline at Pubail, Tongi, 6” dia pipe line at Nimtoli, Mirer Bazar, Tongi, which fell under the Double Track Construction project of Tongi-Bhairob Section of Bangladesh Railway, casing pipe expansion works for the pipelines crossing the Railway Track at Bhairob, Pubail, Tongi and Nimtoli Mirer Bazar, Tongi have been completed;
  • Construction works of 16” Dia x 300 PSIG x 6.0 km pipeline from Shiddhirganj to Godnail TBS,12” dia x 140 PSIG x 8.0 km pipeline from Godnail TBS to Panchabati DRS and Godnail TBS have been completed by company’s own finance in a bid to improving low pressure problem and ensuring stable supply of gas at required pressure to Narayanganj, Godnail, Fatulla, Panchabati, Muktarpur and Munshiganj area so as to achieve production target of industrial customers;
  • Construction work of 20” dia x 1000 PSIG x 600 meter link line from GTCL off-take to Meghnaghat power plant RMS has been completed to connect Meghnaghat 450 MW power plant with BKB- Shiddhirganj gas transmission pipeline constructed by GTCL;
  • Construction work of RMS to connect Shiddhirganj-Godnail 16” dia x 300 PSIG gas transmission pipeline constructed by TGTDCL with BKB-Shiddhirganj gas transmission pipeline constructed by GTCL at its Shiddhirganj RMS off-take has been completed;
  • Reconstruction/rehabilitation work of 12” dia x 140 PSIG x 300 meter gas pipeline at the opposite side of Cotton Development Board, Sreepur, Gazipur in a bid to ensuring uninterrupted gas supply in Gazipur-Joydebpur area;
  • A total of 37 valves of the company have been shifted/reconstructed in order to render Joydebpur-Mymensingh four lane road development project uninterrupted;
  • Reconstruction/rehabilitation work of 1” dia x 50 PSIG x 367 meter gas pipeline at Shaista Khan and Sirajuddaulah road in front of Friend’s Market at Kalirbazar area of Narayanganj City;
  • Pipeline shifting/rehabilitation work along the proposed new loop (2nd Phase) at Sayedabad end of Khilgaon flyover has been completed; and
  • Reconstruction/rehabilitation work of 3” dia x 50 PSIG x 36 meter gas pipeline along Magbazar-Mouchak flyover adjacent to FDC gate by means of LGED’s finance has been completed.
Top